ELTAŞ Transformer – Aliağa Organized Industrial Zone
Category
Endüstriyel Tesisler
Scope of Work
Endüstriyel İnşaat ve Betonarme İşleri
Project Completion Rate
100%
Date: 2024–2026
Within the scope of industrial facility construction at the ELTAŞ Transformer Aliağa Organized Industrial Zone facility, machine foundations, site concrete, retaining wall construction, water tank and administrative building works were carried out.
The project was carried out in accordance with the operational needs of the facility, taking into account structural safety, site coordination, and industrial standards.
