Soma Municipality
In 2012, a district heating system with a capacity of 20,000 keV was installed, originating from the SEAŞ Thermal Power Plant.
Read The Article
In 2012, a district heating system with a capacity of 20,000 keV was installed, originating from the SEAŞ Thermal Power Plant.
The 2013 Narlıdere geothermal heating system pipe replacement project was completed. Pipe replacement works for the 2013 ring line were carried out. The 2010 Sahilevleri line revision project was implemented.
The geothermal heating system installation was completed within the scope of the Armutlu thermal facilities in 2002.
The geothermal district heating system installation was completed in 2006.
Within the scope of the 2015 ORC3-4 Geothermal Power Plant project, pipeline construction works were successfully completed.