ELTAŞ Transformer – Aliağa Organized Industrial Zone

  Category Endüstriyel Tesisler   Scope of Work Endüstriyel İnşaat ve Betonarme İşleri Project Completion Rate 100% Date: 2024–2026 Within the scope of industrial facility construction at the ELTAŞ Transformer Aliağa Organized Industrial Zone facility, machine foundations, site concrete, retaining wall construction, water tank and administrative building works were carried out. The project was carried […]

Read The Article

ENKA – Aliağa Natural Gas Combined Cycle Power Plant

  Category Endüstriyel Tesisler   Scope of Work Altyapı ve Mekanik Tesisat İşleri Project Completion Rate 100% Date: 2001–2003 Within the scope of the ENKA Aliağa Natural Gas Combined Cycle Power Plant, infrastructure, mechanical installations, piping, and hydraulic and structural construction works for the supply of cooling water from the sea were carried out. The […]