Infrastructure Construction

[000769]
25 Apr 26

DSI

Within the scope of the 2014–2015 İzmir Ödemiş Aktaş Plain Irrigation Project, the main pipelines and field applications were successfully completed. Within the scope of the 2010 Çanakkale Gökçeada Steel Pipeline Project, the drinking water transmission lines were completed. Within the scope of the 2003 GAP Project, Section 1 Pumping Irrigation System, large-scale irrigation infrastructure applications were carried out.

Read The Article