Celikler Holding
Category
Jeotermal Sistemleri
Scope of Work
Jeotermal Santral Boru Hatları ve Saha Uygulamaları
Project Completion Rate
100%
History: 2015
Location: Intellectual
Within the scope of the Çelikler Holding ORC3-4 Geothermal Power Plant project, pipeline construction works have been completed.
The project was completed with the aim of strengthening the operational infrastructure of the geothermal power plant, ensuring system security, and contributing to a high-performance energy production process.
