Celikler Holding

Celikler Holding

Category

Jeotermal Sistemleri

Scope of Work

Jeotermal Santral Boru Hatları ve Saha Uygulamaları

Project Completion Rate 100%

History: 2015
Location: Intellectual

Within the scope of the Çelikler Holding ORC3-4 Geothermal Power Plant project, pipeline construction works have been completed.

The project was completed with the aim of strengthening the operational infrastructure of the geothermal power plant, ensuring system security, and contributing to a high-performance energy production process.