Ilbank

Ilbank

Category

Altyapı İnşaat

Scope of Work

Şebeke Hattı ve İçme Suyu Altyapı Uygulamaları

Project Completion Rate 100%

History: 2010
Location: Bolu

Within the scope of İlbank, the Bolu Drinking Water Treatment Plant network line project was implemented.

The project was completed with the aim of supporting safe drinking water transmission, strengthening facility infrastructure, and contributing to uninterrupted service continuity.