Ilbank
Category
Altyapı İnşaat
Scope of Work
Şebeke Hattı ve İçme Suyu Altyapı Uygulamaları
Project Completion Rate
100%
History: 2010
Location: Bolu
Within the scope of İlbank, the Bolu Drinking Water Treatment Plant network line project was implemented.
The project was completed with the aim of supporting safe drinking water transmission, strengthening facility infrastructure, and contributing to uninterrupted service continuity.
