Within the scope of the ENKA Aliağa Natural Gas Combined Cycle Power Plant, infrastructure, mechanical installations, piping, and hydraulic and structural construction works for the supply of cooling water from the sea were carried out.
The project has been completed with technical applications that will contribute to the safe, efficient and sustainable operation of the power plant infrastructure.