İZSU
Category
Altyapı İnşaat
Scope of Work
Borulama, Atıksu Altyapısı ve Arıtma Tesisi İşleri
Project Completion Rate
100%
History: 2009
Location: Izmir / Urla – Torbali
Within the scope of İZSU (Izmir Water and Sewerage Administration), piping works for the Urla Biological Treatment System and infrastructure works for the Torbalı Wastewater Treatment Plant were completed.
The projects were completed with the aim of strengthening wastewater management and environmental infrastructure services, and contributing to the safe and sustainable operation of facilities.
