İZSU Menemen Wastewater Treatment Plant

İZSU Menemen Wastewater Treatment Plant

Work Done

İZSU Menemen 200000 kişilik arıtma tesisi kapsamında arıtma içi proses hatlarının imalatı ve devreye alım işleri Q 1200 mm ve 32 mm muhtelif çaplar.

Firm

İZSU

Location

Menemen – İZMİR

History

2009-2010

Project Completion Rate 100%

Between 2009 and 2010, AYC Group carried out implementations for a wastewater treatment plant project with a capacity of 200,000 people in Menemen, İzmir, within the scope of İZSU (Izmir Water and Sewerage Administration). The project included the manufacturing and commissioning of the process lines within the treatment plant.